Green emery wear-resistant floor
Construction phone number
Plan coverage rate
Divide the ground into certain areas.
. Prepare enough materials for two segmented constructions.
During the first stage of construction, please note that high temperature or windy weather will speed up the curing of the concrete and reduce the allowed construction time
. Wait for the concrete to solidify (light pedestrian traffic leaves about 100 marks)
Excess surface bleeding needs to be evaporated or sucked away.
Tear approximately /~/ of the total amount of material evenly onto the concrete surface.
Smooth
After the material is removed for the first time, the surface will darken, indicating that enough water has been absorbed from the base concrete.
Use a wooden trowel or a polishing machine with a grinding disc to smooth it.
Make sure all corners are completely compacted.
The second stage of construction
Tear off the ground hardener evenly in the direction perpendicular to the first stage.
Smooth it with an electric steel spatula or a disc polisher.
Polishing
When the concrete surface is hard enough and will not be damaged, use a polishing machine with a slightly tilted blade to smooth it and polish it.
, Maintenance with water or special curing agent
, Non-metallic aggregate wear-resistant floor
Green emery wear-resistant floor